Piller UK - Improved Efficiency Data Centres

Modules Redundant - VRLA Battery - Data Centres - Piller UK

How to build improved efficiency Data Centres with 50% less UPS modules

Enterprise Data Centre Case Study

Requirements

  • Scalable
  • Space Optimise
  • Efficient
  • Low Day 1 Capex $$
  • Low Environmental impact
  • Total load 24MW (4MW IT plus 2MW mechanical load building blocks)
  • N+1 distributed redundancy, concurrently maintainable

Considerations

  • Flexible expansion “Pay as You Grow”
  • Reduced plant space $$
  • Low operating costs $$
  • Lower installation costs $$
  • Maximised availability with minimised intervention
  • No future recycling or environmental issues

Solution

  • 24MW total load split 16MW IT and 8MW Mechanical
  • UPS with battery @ LV N+1
  • All systems to be VRLA or Lithium Ion ready
  • VRLA solution selected due to day 1 capital cost

Conclusion

  • UBT+ solution uses 50% less Modules than its nearest competitor
  • UBT+ solution has 33% less Stranded Capacity than its nearest competitor
  • UBT+ solution uses 18% less Space per MW than its nearest competitor
  • UBT+ solution will produce a 9% Saving based on a 10 year TCO over its nearest competitor
10 Year TCO Stranded Capacity *Space **Footprint per MW
  % MW m2 m2 / MW
PILLER
UBT+ 2000 with VRLA Battery
100 2 162 6.8
STATIC Solution A
with VRLA Battery
134 7 275 11.4
STATIC Solution B
with VRLA Battery
110 9 231 9.6
Modular 50 kW STATIC
Solution with VRLA Battery
111 6 196 8.2

*Excludes Input & Output Switchgear    **UPS & Battery Equipment only

 

Solutions No. of Modules Configuration
PILLER
UBT+ 2000 with VRLA Battery
13 12 x IT and Mech 2000kW modules + 1 Redundant
STATIC Solution A
with VRLA Battery
37 5 x IT Systems each with 4 x 1000kW modules + 5 Redundant
5 x Mech systems each with 2 x 1000kW modules + 2 Redundant
STATIC Solution B
with VRLA Battery
26 4 x IT Systems each with 3 x 1500kW modules + 4 Redundant
4 x Mech systems each with 2 x 1500kW modules + 2 Redundant
Modular 50 kW STATIC
Solution with VRLA Battery
72 8 x IT Systems each with 5 x 500kW modules + 8 Redundant
5 x Mech systems each with 4 x 500kW modules + 4 Redundant

 piller logo

Request Piller UK Info

 10 Year TCO Graph

10 Year TCO Graph

 

Piller UK Ltd
Westgate
Phoenix Way
Cirencester
Glos GL7 1RY

Email Piller UK

Tel: 01285 657 721
Fax: 01285 654 823

View / Print Content (PDF)

Request Information From Piller UK - for UK and Europe only

  • *Full Name
  • *Company Name
  • *Telephone
  • *Email
  • *Enter Short Description of Your Requirements
Please tick below to indicate how Piller UK may contact you. You may leave any box blank.
  • By Email
  • By Post
  • By Phone
  • By SMS

To Subscribe to our twice-weekly BuildingDesign e-Newsletter tick here:

  • * Please enter numbers shown for validation purposes
We will not share any of your details with any third parties or subsidiaries. You have the right to withdraw or change your consent at any time by contacting Piller UK. Company details can be found here »

Click here to read our Privacy Notice »