Precolor Tank Division - Operating & Installation Manuals

Click on the links below to view a manual:

Inspection & Maintenance

We recommend that our tanks are inspected once every six months, more frequently if there is a reason to suspect contamination

Semi Sectional Tank Installation

We recommend that a strip of sealer should be fitted between each flange of the tank (ensuring each bolt hole is covered)

Sectional Tank & Installation Conditions

The supply of fittings and connections is not included in our prices unless otherwise stated.

AD52  Magnetic Level Controls

Suitable to control and monitor the fluid level in open and under pressure tanks up to 10 bars

Underground Tanks

When burying tanks below ground level, care should be taken regarding the ground water table level or the possibility of surface water creating external pressure to the underside of the base

Precolor Tank Division Logo

Precolor Tank Division
Newport Road
Market Drayton
Shropshire
TF9 2AA

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation