- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

EURO-DIESEL UK - History Timeline

1984

  • Conception of the first NO-BREAK KS® where the initial design was based on an energy accumulator consisting of a single, electrical machine with two rotors

1986

  • Launch of the first NO-BREAK KS®1
  • First delivery of the NO-BREAK KS®1 for Léopold II road tunnel in the heart of Brussels (300 kVA & 500 kVA)
  • 4 of such machines had faithfully worked for 17 years for this tunnel, before being replaced with a more powerful system -- the NO-BREAK KS®5 -- in 2003

1988

  • Launch of the first NO-BREAK KS®2
  • First delivery of the NO-BREAK KS®2 for Cegeka in Hasselt (700 kVA, a KS-SB system)

1989

  • Establishment of EURO-DIESEL SA in Grâce-Hollogne, Belgium
  • Establishment of EURO-DIESEL (UK) Ltd in Cirencester, UK

1990

  • Acquisition of DIESEL-ELECTRIC SA, a company created in 1976 for the conception, fabrication and maintenance activities of Generator-Sets
  • to view the rest of Euro-Diesel's milestones from 1984 to date.

    EURO-DIESEL UK Ltd
    First Floor 101/102
    Cirencester Business Park
    Love Lane
    Cirencester
    Glocs
    GL7 1XD

    Request Information

    • Full Name
    • Company Name
    • Telephone
    • Email
    • Requirements
      Please tick below to indicate how EURO-DIESEL UK may contact you.
      You may leave any box blank.
      • Email
      • Post
      • Phone
      • SMS
    • Validation
    We will not share any of your details with any third parties or subsidiaries. You have the right to withdraw or change your consent at any time by contacting EURO-DIESEL UK. Company details can be found here »

    Click here to read our Privacy Notice »