- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

Kingspan Industrial Insulation
CPD Seminar Information

Click on the links below to request more information about a CPD:

Request Mechanical Information

Limiting the effects of Overheating in Building Services Applications

AECOM research has suggested that the use of an enhanced specification of pipe insulation and insulated pipe supports on hot water and heating pipework can reduce building overheating.

Issues examined include:

  • void & corridor space overheating
  • benefits of going beyond the basic Building Regulation requirements
  • optimising the design & implementation of building services insulation
  • Discipline:
  • Mechanical
  • Location:
  • Client Offices
  • Duration:
  • 45 minutes
  • Accreditation:
  • CIBSE
  •    CIBSE CPD Accreditation

All speakers are experienced in HVAC, Building Services
and Pipe & Duct Insulation industries

Innovations in Pipe Insulation Systems for
Building Services / HVAC Applications

This CPD examines the issues surrounding the insulation of pipework and building services equipment and includes:

  • Background to Kingspan Industrial Insulation
  • Introduction on rigid insulation types and thermal performance
  • Fire and Smoke performance
  • Building regulations and installation standards
  • Energy savings and Environmental issues
  • Product Innovations
  • Duct Insulation Solutions
  • Discipline:
  • Mechanical
  • Location:
  • Client Offices
  • Duration:
  • 60 minutes
  • Accreditation:
  • CIBSE
  •    CIBSE CPD Accreditation

Rethinking Ductwork

This presentation aims to educate listeners on Part L 2013
Building Regulations:

  • Part L 2013 Building Regulations, TIMSA and BS 5422: 2009
  • How pre-insulated ductwork can aid easy compliance
  • Implications of ductwork air-leakage when trying to achieve the BER
  • Heat loss and heat gain requirements of HVAC insulation
  • Benefits of incorporating pre-insulated ductwork into building design
  • Question & Answer
  • Discipline:
  • Mechanical
  • Location:
  • Client Offices
  • Duration:
  • 60 minutes
  • Accreditation:
  • CIBSE
  •    CIBSE CPD Accreditation