- BuildingDesign Construction Directory
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

Danfoss - CPD / Seminar Information

Click on the links below to request more information about a CPD:

Request Architectural Information Request Electrical Information Request Mechanical Information

Frequency Converters in Building Services

Are you up-to-date with the current techniques and technology of variable speed drivers for building services application?

  • What is a Frequency Converter?
  • Why use Frequency Converters?
  • Energy saving benefits of VSDs on fans and pumps
  • The application of VSDs to building services
  • EMC & Harmonics: characteristics and minimisation
  • Practical demonstration
  • Discipline:
  • Arch Elec Mech
  • Location:
  • Client Offices
  • Duration:
  • 60 minutes
  • Accreditation:
  • non-accredited

Introduction to CIBSE Code W-2010 and BSRIA BG2-2010 Water Commissioning Guide

In September 2010, CIBSE introduced a significant update to Code:W which relates to water distribution system commissioning.
To accompany the new code BSRIA simultaneously launched its own guide to water commissioning BG2-2010. To inform mechanical engineers, Danfoss has launched a new CPD seminar to highlight key changes to the code.
The seminar gives an introduction to new methods of commissioning automatic balancing valves, along with updates to guidelines on flow rate tolerances, radiator balancing and commissioning low flows.

Intended Audience: Mechanical Consultants and Contractors with design responsibility.

  • Discipline:
  • Mech
  • Location:
  • Client Offices
  • Duration:
  • 45 minutes
  • Accreditation:
  • CIBSE
  •    CIBSE CPD Accreditation

The Complete Balancing Solution
for Variable Flow Systems
Part 1 - Heating

In Part 1 of the complete balancing solution we look at control and balance of heating systems.
This covers the main applications of 2 pipe radiator systems, underfloor heating circuits, and de-centralised plant control and balance.
We look at the sizing of pressure controllers and at methods of system bypass for pump protection.

Intended Audience: Mechanical Consultants and Contractors with design responsibility.

  • Discipline:
  • Mech
  • Location:
  • Client Offices
  • Duration:
  • 35-40 minutes
  • Accreditation:
  •    

The Complete Balancing Solution
for  Variable Flow Systems
Part 2 - Cooling

In Part 2 of the complete balancing solution we look at balance and control of cooling systems. This covers the main applications of fan coil, chilled beam, and air handling unit control and balance. We look at the advantages of pressure independent control valves in improving control authority, reducing pump energy usage, and the potential savings on system installation and commissioning. Intended Audience: Mechanical Consultants and Contractors with design responsibility.

  • Discipline:
  • Mech
  • Location:
  • Client Offices
  • Duration:
  • 35-40 minutes
  • Accreditation:
  •