- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

Marshall-Tufflex - Case Studies

Click on the links below to read more information about a case study:

Two galleries for temporary exhibitions each requiring a different display layout with corresponding power supplies.

Odyssey was installed as part of a £1million makeover, to create 30 modern, multi-use offices.

The £22 million Arts and Sports Academies at the Bede Campus required an integrated cable management solution.

The Twin165 CAT 6 compliant trunking system impressed the Academy and the project team of its specification merits.

Hard-wearing, good-looking & lightweight, for when robustness, extra mechanical strength and a higher cable capacity is required.

A triple product mix of all-curved Odyssey trunking, DDA-compliant blue accessory boxes and free-standing Powerpoles.

The refurbishment within Durham University's library demonstrates how well-specified cable management can enhance the final look.

Balfour Beatty Engineering Services required good-looking DDA compliant trunking systems for large amounts of data handling.

The University’s city centre Portland Building chooses Marshall-Tufflex’s Steel System 130 as suitable trunking.

Restricted desk-to-window height throughout a new £17million academy meant Twin165 was the perfect solution for the scheme.

Marshall-Tufflex Ltd
Churchfields Industrial Estate
Hastings
East Sussex
TN38 9PU

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
  • Validation