- BuildingDesign Construction Portal
  • Request Product Information
  • Connect With Us
  • Follow BuildingDesign on Twitter Connect with BuildingDesign on LinkedIn Become a fan on Facebook Follow BuildingDesign on Pinterest Follow BuildingDesign Media on Google+

LG Electronics - Case Studies

Click on the links below to read more information about a case study:

StudioSixMusic

The Multi V S Heat Pump was a perfect fit for the alley way and ensured delivery of 12.5kW of cooling for the 5 basement studios.

Gosport Ice Rink

The Therma V range of air source heat pumps has provided heat below the ice rink insulation to ensure permafrost doesn't occur.

Pendennis Shipyard

LG's exceptional Multi V IV Heat Recover VRF units are the perfect response to heating and cooling for large public buildings.

B&Q Bristol

B&Q will have a fully compliant air con system in all their ‘back of house’ areas after an R22 refrigerant replacement programme.

The National Memorial to the Few at Capel-le-Ferne

LG’s remote return air sensors have been installed in zones to ensure accurate control of space temperature.

710 Aztec House

Multi V Heat Recovery VRF system has been chosen for a 20,000sq ft refurb on a two-storey glass front office block building.

LG Electronics UK Ltd
AE Department
Velocity 2
Brooklands Drive
Brooklands
Weybridge
Surrey KT13 0SL

Request Information

  • Full Name
  • Company Name
  • Telephone
  • Email
  • Requirements
    Please tick below to indicate how LG Electronics may contact you.
    You may leave any box blank.
    • Email
    • Post
    • Phone
    • SMS
  • Validation
We will not share any of your details with any third parties or subsidiaries. You have the right to withdraw or change your consent at any time by contacting LG Electronics. Company details can be found here »

Click here to read our Privacy Notice »